West Tower Repairs 2006 - October 29, 2006 Work Party
Station Engineer John Fore W6LD, reports another successful work party on Sunday, October 29, 2006 at Site 530.
- We bracketed the lower point of the mast (to permit removal of
the lower thrust bearing and rotator) using our custom-build bracket
system;
- We moved the rotator shelf and lower thrust bearing to a point
42" below their original placement in the tower; and
- We removed the rotator for some maintenance and repair work
(e.g., painting where there is some rust and repairs to the
mast-to-rotator coupling to eliminate the "weathervaning" of the antenna
over about a 15 degree angle that was a result of a defect in the
original installation and has resulted in constant and inappropriate
"wear and tear" on the entire antenna system).
- We also made progress on installation of an all-weather box at the
center pole of the 80 meter 4 square -- which is needed as a first step
to repair the 4 square by finally putting in place permanent connections
for the relay control system, dummy load and phasing system -- thanks to
the efforts to Larry and Dave when they were not actively helping with
the tower work.
It was a beautiful day and a lovely way to spend a Sunday afternoon and
we had a great turn-out.
- Thanks to Randy Ahlkvist for his third Sunday of approx. 6 hours of
on-the-tower work.
- Thanks to Tom Berson, Dave Fichou and Larry Rebarchik for much needed
ground support (which is much more work than one might initially think
given all the hoisting of tools and equipment over the course of the
day).
- We also had cameo appearances with moral support by Mark Schreiber (who
was at the shack briefly to gather the final CQ WW ssb logs from club
contesting efforts this weekend) and Harry Makler (who is just beginning
to recover from walking pneumonia following his recent travels to SAm
and Africa).
Next steps:
- We are ready to bring a crane in for removal of the damaged mast and
installation of the new mast. As soon as we find our way through the
appropriate University process, we'll schedule it; probably next week or
the week thereafter during the work week. Please keep posted as we'll
need some help and most folks with have conflicts during the work week.
- Meanwhile, Randy Ahlkvist is completing the machining of the top
plate/3" thrust bearing adaptor plate and repairs and maintenance on the
rotator.
Notes Regarding Some Other Near-Term Projects:
We have a number of deferred projects. Some of the key ones which I
view as nearer term are:
- 4 square repair - this is something we will be moving forward
with in the coming weeks. We have most of the materials and equipment.
We will be purchasing a surplus dummy load to replace the dummy load
that was burned out at an approximate cost of $300.
- Replacement of truss support systems on the 4 element 40 meter
yagi and the 6 element 20 meter yagi - this project should be completed
this year to ensure survival of the antennas. We need to purchase some
inexpensive hardware (which we already have for the 40 meter yagi) and
then use the University bucket truck for the work. It will make sense
to schedule this as soon as possible following the completion of the
repairs to the West tower.
- Removal of six meter yagi to the telephone pole to North side of
building - requires installation of brackets (already purchased) and
rotator (need to purchase) on the telephone pole. We can use a mast
that is surplus from our damaged mast from the West tower. Then we move
the yagi from the UHF/VHF tower to that location. We need to get this
done before winter storms; pending completion of this project we will
need to remove the six meter yagi from the tower for the winter season
to ensure that the tower is not overloaded during a storm. Contact me
if you are interested in helping make this project happen.
- Installation of permanent feedlines to UHF/VHF antennas -this
can be done as soon as we remove the six meter yagi from the tower. All
the feedline and hardline has been purchased (very expensive Andrew
Heliax 1/2" superflex and connectors). Contact me if you are interested
in helping make this project happen.
- Removal of Pro67A beam and installation of repaired upper
bracket with thrust bearing, new mast (salvage from West tower mast),
new feedline and rotator control cable and refurbished rotator. All
parts are on hand, except that we need to send one of our currently
unused older rotators back to RotorDoctor to be refurbished before
proceeding. Contact me if you are interested in helping plan out this
project and make it happen.
We will stage projects as time and interest of club members permits.
Meanwhile, if there is a repair or improvement you are interested in
making happen, contact me and we'll talk about the details including
timing and availability of support.
That's the update for now. For the moment, the really great news is the
old fractured boom to mast plate has been replaced and much of the load
on the damaged mast removed.
For now, the 15 and 20 meter yagis on the West tower are set fixed at
about 75 degrees.
THE ROTATOR AND TOWER POWER HAS BEEN SWITCHED
OFF. DO NOT ATTEMPT TO REACTIVATE OR USE.
Thanks and 73,
John, W6LD